explosion proof electric hoist
Manufacturing units shall have obtained the lifting machinery
manufacturing license, before engaging in a corresponding manufacturing
activities.
Lifting machinery manufacturing licensee classification
management, manufacturing units made manufacturing license shall have
appropriate conditions for the implementation of the specific
requirements of technical specifications in accordance with the relevant
safety and other regulations.
Lifting machinery manufacturing license is valid for four years.
Manufacturing
license period shall expire on the renewal application written six
months ago; after examination, licensing authorities should make the
decision to grant the license or not to license before the expiry date.
Hoisting
Machinery Manufacturing expiry without renewal of the license, shall
continue in lifting machinery manufacturing activities.
Manufacturing units shall adopt technical specifications meet the safety requirements of the lifting machinery design files.gantry crane manufacturerIn
accordance with the requirements of safety specifications, type tests
should be lifting products, lifting machinery parts or trial of new
products, new parts, must be the whole or part of the type test.
Lifting
machinery manufacturing process should be in accordance with the scope
of the technical specifications and other safety regulations, and
requirements of the project, from the manufacturing location of
inspection and testing institutions supervision and inspection.Manufacturing
units manufactured in the workplace should be permitted lifting
machinery; but the structure can not be split and transport overrun, you
can use the on-site manufacturing, from the location of the
manufacturing site inspection agency supervision and inspection in
accordance with safety specifications and other requirements.
Manufacturing
units shall be the main force structure (the main beam, main boom, the
main support legs, standard section, the same below) for all orders
processed or purchased and used in lifting machinery.
The main part
of the force structure required to purchase or commission processing,
manufacturing units should be entrusted to obtain the appropriate type
and level of qualification of lifting machinery manufacturing units
processed or purchased mainly by the force structure of its processing
and for lifting machinery.
When lifting machinery factory, it should
be accompanied by the design documents (including the total figure,
mainly due to the force structure diagrams, mechanical drawings and
electrical transmission, hydraulic system schematics), product quality
certification, installation and use and maintenance instructions,
supervision and inspection certificate, about the type test certificate
and other documents.
Metal skeleton structure is a crane, the main bearing member such as bridge, boom and mast may be a box structure or truss structures, but also for the web structure, and some can be used as the supporting steel beams.
2015年2月18日星期三
2015年2月14日星期六
electromagnet overhead crane control system in the crane size vehicle control principle
This article will introduce the electromagnet overhead crane control system in the crane size car control principle:
SCM central processing system, real-time status and position information gathering work of the master switch, the central processor via the control unit for information processing, the use of 485 to achieve information from the control unit to the execution unit of transmission, thus completing the electromagnet overhead crane size car motor control, and then realize shipbuilding gantry crane left and front right information and the car stalls, control, rear and gear information.The size of the vehicle control system panel is shown in two shows:
Mute switch: turn on the switch, turn off the sound travels carts; turn off the switch, turn on the sound travels carts;
Hammer instructions: Tips reached the limit height;
Hammer Reset: height when it reaches the limit, use the hammer reset button in special circumstances can lift limit increase;
Operating lever: front push each car five stalls, each pushing carts around five stalls, to the execution unit can transmit different instructions;
Phase voltage switch: Turn the switch can adjust voltmeter shows AB, AC, BC, the voltage value of any two phases.
SCM central processing system, real-time status and position information gathering work of the master switch, the central processor via the control unit for information processing, the use of 485 to achieve information from the control unit to the execution unit of transmission, thus completing the electromagnet overhead crane size car motor control, and then realize shipbuilding gantry crane left and front right information and the car stalls, control, rear and gear information.The size of the vehicle control system panel is shown in two shows:
Mute switch: turn on the switch, turn off the sound travels carts; turn off the switch, turn on the sound travels carts;
Hammer instructions: Tips reached the limit height;
Hammer Reset: height when it reaches the limit, use the hammer reset button in special circumstances can lift limit increase;
Operating lever: front push each car five stalls, each pushing carts around five stalls, to the execution unit can transmit different instructions;
Phase voltage switch: Turn the switch can adjust voltmeter shows AB, AC, BC, the voltage value of any two phases.
2015年2月8日星期日
industrial overhead cranes control system replacement parts
industrial overhead cranes
control system contains a large number of components, parts are all
life, and therefore industrial overhead cranes control system after
long-term use will inevitably need to replace some parts. This article
is to explain the replacement double girder overhead travelling crane control system components.
If the component fails, the need to pay attention to the compatibility of the replacement parts.
If the solid state relay failure, you need to pay attention to:Solid-state relays are key components, the first wife of marine science and technology solid state relays have to undergo rigorous testing and screening, the technical indicators on the market for sale than ordinary solid state relays; and products from different manufacturers, pin locations are often different arrangement, user error take the case of repeated occurrence, in order to ensure reliable operation of the controller, it is recommended to buy spares from my company.
Need special tools to install a solid state relay replacement. To ensure reliable recommends that users install the control system will fail to return the company to repair.
Note: You must replace the parts by professionals. Do the leads or metal objects left in the machine to avoid fire;
Danger Never remodel JH-DSC, Otherwise, electric shock, accidents; after replacing the motherboard, you must run before the corresponding parameter settings, otherwise there is a risk of damaging the JH-DSC
If the component fails, the need to pay attention to the compatibility of the replacement parts.
If the solid state relay failure, you need to pay attention to:Solid-state relays are key components, the first wife of marine science and technology solid state relays have to undergo rigorous testing and screening, the technical indicators on the market for sale than ordinary solid state relays; and products from different manufacturers, pin locations are often different arrangement, user error take the case of repeated occurrence, in order to ensure reliable operation of the controller, it is recommended to buy spares from my company.
Need special tools to install a solid state relay replacement. To ensure reliable recommends that users install the control system will fail to return the company to repair.
Note: You must replace the parts by professionals. Do the leads or metal objects left in the machine to avoid fire;
Danger Never remodel JH-DSC, Otherwise, electric shock, accidents; after replacing the motherboard, you must run before the corresponding parameter settings, otherwise there is a risk of damaging the JH-DSC
订阅:
博文 (Atom)