To facilitate the operator to pinpoint load, easy and efficient;Jacking equipped with precision tapered roller bearings and roller assembly longer life, semi gantry cranes provide protection for the smooth operation;Triangle support plate gussets minimizes deflection crane to the precise positioning of the load easier to operate when the electric wire rope hoist manufacturers can effectively prevent accidental movement of the support frame assembly up
Metal skeleton structure is a crane, the main bearing member such as bridge, boom and mast may be a box structure or truss structures, but also for the web structure, and some can be used as the supporting steel beams.
2016年1月30日星期六
2016年1月25日星期一
over head cranes feature
You can complete the most difficult task overhead gantry cranes, can take frequent overhead material handling work, column jib crane provides a circular work area covering the good work, and support tools balancers, air balancers, vacuum lifting tools and gourd. At present, the domestic supply of high-Bo is a steel pillar jib crane, from the weight of up to 5 tons, arm length up to 6 meters, it can achieve a 360 ° rotation of the lifting operation, the use of ground installation, not to the building the roof structure to exert pressure, the use of prefabricated standard modular design structure, over head cranes can easily be extended to work with the center of the cell and extended, easy to install, move equipment and lightweight
2016年1月20日星期三
Widely used in different places in various industries
column jib crane is also called, is a recently developed small and medium lifting equipment, unique structure, safe and reliable, with high efficiency, energy saving, time-saving, flexible features, three-dimensional space was within the random operation, paragraph spacing, intensive transporting of the occasion, but also shows overhead crane company superiority over other routine lifting equipment. Widely used in different places in various industries
2016年1月15日星期五
Safety
Top positioning pin which can effectively prevent accidental movement of the support frame assembly upward.
Full rated load applications: explosion proof hoist, crane rated 15% by weight of the consideration for the hoist, trolley hoist and lower the total weight of the hook means 25% of the rated load of the crane to consider the impact load. We can provide customers with full rated load applications cranes spare parts products
Full rated load applications: explosion proof hoist, crane rated 15% by weight of the consideration for the hoist, trolley hoist and lower the total weight of the hook means 25% of the rated load of the crane to consider the impact load. We can provide customers with full rated load applications cranes spare parts products
2016年1月10日星期日
Easy to install
Separate carriage assembly during installation and cantilever separately from installation, easy to install;
Embedded bearing components enable additional headroom required for installation is greatly reduced;
Bolted between the support frame assembly and the arm so that the installation work can be carried out separately, single girder crane can be very close to the arm mounted on the roof or top obstacles underneath the plant to minimize the space occupied by the top, increasing the lift hoist;
Hoist trolley run stopper bolt can be installed according to the application changing positions;
over head cranes completely sealed bottom inlet collector assembly can then be pre-installed or installed. 360 °rotating meet application environment for the hoist power supply
Embedded bearing components enable additional headroom required for installation is greatly reduced;
Bolted between the support frame assembly and the arm so that the installation work can be carried out separately, single girder crane can be very close to the arm mounted on the roof or top obstacles underneath the plant to minimize the space occupied by the top, increasing the lift hoist;
Hoist trolley run stopper bolt can be installed according to the application changing positions;
over head cranes completely sealed bottom inlet collector assembly can then be pre-installed or installed. 360 °rotating meet application environment for the hoist power supply
2016年1月5日星期二
luffing the luffing cylinder and hydraulic system components
In order to complete construction crane functions, electric hoist manufacturers construction cranes are generally supported by the base portion and the upper portion of vehicle operation, etc., for mobile cranes, the base includes a support portion of the chassis on the road and other load-bearing structure and chassis legs, over head cranes while the chassis also powered through the center of the rotary body to work on the car; the car operation portion includes a turning mechanism on the car to achieve a 360-degree rotating support, slewing gear, rotary hydraulic system consisting of a full rotation
订阅:
博文 (Atom)